Crescent Chase Drainageway

Project Description
The project is located west of NW 86th Street and north of Crescent Chase adjacent to the Crescent Chase Apartments and Stonepointe Townhomes. This drainageway extends westerly to approximately NW 94th Street and includes a number of developed areas and areas which have yet to develop, including Windsor Office Park. The entire drainageway is experiencing erosion and the resulting silt is causing issues downstream. The proposed project would be the construction of a best management practices and other improvements which would control the flow of this channel and include improvements necessary to reduce the silt and debris from continuing downstream, including bank stabilization.
Project Area Map
Click here (PDF) to view the map

Project Open House
A letter (PDF) has been mailed to area residents regarding an open house that has been scheduled to solicit resident feedback and observations, this meeting has been scheduled for:

November 13, 2019
5:30 – 6:30 p.m.
Johnston City Hall
6221 Merle Hay Road
Johnston, IA 50131
Estimated Cost
$2,000,000 covering engineering and construction

Schedule
Design – Fall 2019
Construction – Spring/Summer 2020

Contractor
TBD

Engineer
Eva Moritz, P.E.
Foth Infrastructure and Environment
515.251.2524